Project

Verification of stray currents for Münchensteinerbrücke Basler Verkehrsbetriebe 12/2017

After the successful, on-time completion of the Münchensteinbrücke construction projects, the new measurement of the stray current discharge coating on streetcar tracks was made on 5 December 2017. In so doing, the measurement procedure according to EN 50122–2:2010 Appendix A.4 was used.

The measurements are made during the day. BVB guarantees accessibility and that prerequisites for work safety will be met.